Sunphotometer 2013
Last modified by levula@helsinki_fi on 2024/02/07 06:31
20130321 13:00 Cimel installed and measurements started. JL, RP.
20130327 ~15:00 Cimel visited due to satellite connection problems. Problem solved with the undefined manner. JL
20130403 10:40 Cimel clock adjusted by 75 seconds. JL
20130511 "Early morning" Cimel down due to power failure in the network.
20130521 ~09:00 Power problem solved and measurements restarted. RP.
20130527 10:40 Fi1 parameter changed from 2 to 4. Clock adjusted - 10 seconds. JL.
20130625 10:00 Cimel removed from the tower and measurements stopped. JL, RP
20130626 14:00 Cimel installed on the roof of Hyytiälä cold machinery hall and measurements restarted. JL, RP, ML
20130705 12:00 The satlink and it's power replaced. JL