Sunphotometer 2012
Last modified by levula@helsinki_fi on 2024/02/07 06:31
20120806 ~11:00 - 12:00 The collimator cleaned (some spiders wed) and clock adjusted. JL
20120403 Cimel reinstalled after calibration and measurements started. JL, RP
20120410 11:44 Instrument clock adjusted ~40 sec forwards. JL
20120607 15:00 New sls-file loaded into the Satlink and collimator cleaned with compressed air. JL